Craft Beer Manufacturing Facility Can’t Afford Downtime for Moisture Mitigation

Wachusett Brewing Company reached out directly to Black Bear to replace the boxing and shipping area of the beverage manufacturing plant.

Project Overview
Wachusett Brewing Company reached out directly to Black Bear, having previously partnered with the company for renovations and repair. The boxing and shipping area of the beverage manufacturing plant needed replacement flooring to better accommodate the space. Once Black Bear engineers assessed the area, it was determined that new drains needed to be installed and a mitigation system would precede the top coat to protect against moisture.
The Process
  • STEP 1
    Equipment removal and relocation
  • STEP 2
    Install new drains in space
  • STEP 3
    Pitch floors to new drains
  • STEP 4
    Use Dur-a-Flex Poly-Crete MDB at ¼ inch
  • STEP 5
    Apply top coat of ColorFast Dark Gray
Project Details
  • Project Name - Wachusett Brewing Co.
  • Type of Business - Beverage Manufacturing
  • Location - Westminster, Massachusetts
  • Timeframe - 3 Days
  • Products - Dur-a-flex Poly-Crete MDB with Colorfast
Challenges
As an active manufacturing plant, Wachusett Brewing could not afford any downtime during renovation and installation. Black Bear crews needed to work around their production and within tight timelines. Black Bear needed to complete the pitched drains within a day in order to complete the full installation over three days and avoid project delays.

Black Bear's Solution

Black Bear was familiar with the plant, and was quick to adapt to the renovations needed for specific areas of the facility. The shipping spaces required installing a pitched drain and a new mitigation system before retrofitting the entire space about the client with a new floor system.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Assessment

Case Studies

Proven Results Through Real Cases

Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...

Continue Reading…
Leveling the Ground at Babson’s Innovation Center

Black Bear was brought in to integrate existing concrete slab with new concrete floors that would complete the re-envisioned room

Continue Reading…
Waterproofing & Moisture Mitigation for Multi-Level Commercial Kitchen

Black Bear was asked to propose solutions for both moisture control, and easier maintenance in an area that adheres to FDA health codes and OSHA...

Continue Reading…
VCT Commercial Floor Replacement for Shaw’s Supermarket

Shaw’s Supermarket needed a cost-effective, longer lasting solution that would replace the existing failing VCT commercial flooring.

Continue Reading…

NewsLetter

Subscribe to our newsletter and stay updated!