Case Study Detail
With experience engineering and installing new commercial coatings systems for the healthcare industry, their GC knew that Black Bear was uniquely qualified for the job.
Black Bear developed a comprehensive scope of work that scheduled phases to align with the hospital’s shutdown periods. Crews prepped existing bathrooms and waterproofed areas before applying the new coatings. A decorative flake was designed to complement the spaces. When renovation was complete, Black Bear scheduled installation of epoxy floors, walls, and shower systems in the new build lavatories.
Takes just 2 min
Take the AssessmentCase Studies