Northeast’s leading seamless? Call Us Now 978-405-0017

Connect With Us: Social Social Social Social

Industries Served

Our Services

Our Resources

Our Projects

Service Areas

About Black Bear

Help & Support

Case Study Detail

Long-term Project for Hospital Campus Results in Long-term Performance

With experience engineering and installing new commercial coatings systems for the healthcare industry, their GC knew that Black Bear was uniquely qualified for the job.

Project Overview
UMass Memorial Health System embarked on a long-term renovation and new construction endeavor. With experience engineering and installing new commercial coatings systems for the healthcare industry, their GC knew that Black Bear was uniquely qualified for the job. UMass Memorial required renovation of lavatories to improve long-term performance and minimize the need for repair. In addition, they had aesthetic requirements to enhance the environment and coordinate with existing corridors and neighboring spaces.
The Process
  • STEP 1
    Bathroom renovation
  • STEP 2
    Scheduled shutdown of hospital wing
  • STEP 3
    Lay DuraFlex coatings over existing tile
  • STEP 4
    Install wall system epoxy with decorative flake
  • STEP 5
    Apply urethane topcoats
  • STEP 6
    New bath install of floor, wall, & shower systems
Project Details
  • Project Name - UMass Memorial: Campus Lavatories
  • Type of Business - Healthcare
  • Location - Worcester, Massachusetts
  • GC/Architects - SLAM Collaborative & Consigli
  • Size - 28 Bathrooms
  • Timeframe - Phased over 2-3 years
  • Products - DuraFlex Epoxy & Urethane
Challenges
Despite the project spanning close to three years, tight timelines dictated each phase to accommodate scheduled shutdown periods. In addition, existing bathrooms required extensive waterproofing due to their proximity to labs, patient rooms, and offices. Subsequent leaking would result in slowed productivity and the possibility of additional corridors and campus buildings requiring repair.

Black Bear's Solution

Black Bear developed a comprehensive scope of work that scheduled phases to align with the hospital’s shutdown periods. Crews prepped existing bathrooms and waterproofed areas before applying the new coatings. A decorative flake was designed to complement the spaces. When renovation was complete, Black Bear scheduled installation of epoxy floors, walls, and shower systems in the new build lavatories.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Assessment

Case Studies

Proven Results Through Real Cases

REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR
REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR

Black Bear Seamless Flooring transformed Heav’nly Donuts Factory & Warehouse with a urethane cement floor, improving durability, safety and compliance.

Continue Reading…
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL

Black Bear Seamless Flooring modernized bathrooms with seamless, low-maintenance epoxy systems for a safer, more stylish campus experience.

Continue Reading…
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions

The Black Bear Seamless Flooring team provided a flawless Grind & Seal flooring solution to enhance durability and mitigate dust for the leading engineering company.

Continue Reading…
Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...

Continue Reading…

NewsLetter

Subscribe to our newsletter and stay updated!