Case Study Details

Solving An Uphill Battle for Stratton Mountain Commercial Kitchen Flooring

Project Details
Black Bear spent a week on the jobsite at the Stratton Mountain resort to value engineer a solution that would provide greater coverage and durability in two commercial kitchens. The existing flooring was difficult and costly to maintain
The Process
  • STEP 1
    Prep existing hardwood floors for urethane overlay
  • STEP 2
    Install Fiberglass Mesh Tape with ¾ oz. per sq.ft.
  • STEP 3
    Waterproof with flexible epoxy membrane over wood at 4 inches off the walls
  • STEP 4
    Install Dur-A-Flex Elast-O-Coat
  • STEP 5
    Apply Poly-Crete MDB at ¼ inch
  • STEP 6
    Use a ColorFast top coat with a 6 inch seamless cove
Project Details
  • Project Name - Stratton Mountain: 2 Commercial Kitchens
  • Type of Business - Hotel and Lodging
  • Location - South Londonderry, Vermont
  • Size - 1,800 and 2,400 square feet
  • Timeframe - 6 Days
  • Products - Fiberglass Mesh Tape, Duraflex Elast-O-Coat, Polycrete MDB, ColorFast top coat sealer
Challenges
This project required extensive prep of deteriorating wood floors prior to installing a waterproof, cementitious urethane. Black Bear also needed to select the correct drain details quickly to make the job’s tight deadline. Scheduling and long distance coordination was a challenge which Black Bear managed with the general contractor and facilities manager.

Black Bear's Solution

It was determined that a waterproofing system was needed to provide greater protection from the wet spaces and food and liquid byproducts. With the kitchens situated adjacent to visitor areas of the facilities, Black Bear provider greater protection against moisture that could damage existing nearby structures. In addition, a cementitious urethane was engineered to upgrade their existing floors to a more durable and easily maintained solution for the high-traffic kitchens.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Assessment

Case Studies

Proven Results Through Real Cases

REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR
REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR

Black Bear Seamless Flooring transformed Heav’nly Donuts Factory & Warehouse with a urethane cement floor, improving durability, safety and compliance.

Continue Reading…
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL

Black Bear Seamless Flooring modernized bathrooms with seamless, low-maintenance epoxy systems for a safer, more stylish campus experience.

Continue Reading…
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions

The Black Bear Seamless Flooring team provided a flawless Grind & Seal flooring solution to enhance durability and mitigate dust for the leading engineering company.

Continue Reading…
Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...

Continue Reading…