Northeast’s leading seamless? Call Us Now 978-405-0017

Connect With Us: Social Social Social Social

Industries Served

Our Services

Our Resources

Our Projects

Service Areas

About Black Bear

Help & Support

Case Study Details

Waterproofing & Moisture Mitigation for Multi-Level Commercial Kitchen

Black Bear was asked to propose solutions for both moisture control, and easier maintenance in an area that adheres to FDA health codes and OSHA safety regulations.

Project Overview
The Hynes Convention Center’s commercial kitchen spans two floors and portions of the existing floor were showing signs of wear, with water leaking through the foundation. Black Bear was asked to propose solutions for both moisture control, and easier maintenance in an area that adheres to FDA health codes and OSHA safety regulations.
The Process
  • STEP 1
    Assess multi-level work site and identify areas that required extra waterproofing
  • STEP 2
    Install Dex-O-Tex waterproofing membrane
  • STEP 3
    Apply Dur-A-Flex moisture mitigation primer
  • STEP 4
    Lay urethane mortar for extra layer of protection
Project Details
  • Project Name - The Hynes Convention Center Commercial Kitchen Waterproofing and Remodel
  • Type of Business - Multi-Use / Event Facility
  • Location - Boston, Massachusetts
  • Size - 8,900 sqft
  • Timeframe - 1 Year
  • Products - Dex-O-Tex, Dur-A-Flex
Challenges
Black Bear needed to accommodate a busy, multi-level kitchen servicing the entire facility. With moisture and seepage the primary concern, it needed to be addressed before new flooring was installed.

Black Bear's Solution

Black Bear value engineered a solution with two main components – water proofing and new commercial flooring. Black Bear installed a waterproof membrane in addition to a moisture mitigation primer before laying the cementitious materials with a urethane mortar which added another layer of protection. The extra layer of water proofing in the base of the concrete provided the reassurance the client required to eliminate leakage and avoid costly repairs. The new industrial epoxy flooring offered the durability and ease of maintenance needed in the large commercial kitchen.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Assessment

Case Studies

Proven Results Through Real Cases

REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR
REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR

Black Bear Seamless Flooring transformed Heav’nly Donuts Factory & Warehouse with a urethane cement floor, improving durability, safety and compliance.

Continue Reading…
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL

Black Bear Seamless Flooring modernized bathrooms with seamless, low-maintenance epoxy systems for a safer, more stylish campus experience.

Continue Reading…
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions

The Black Bear Seamless Flooring team provided a flawless Grind & Seal flooring solution to enhance durability and mitigate dust for the leading engineering company.

Continue Reading…
Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...

Continue Reading…

NewsLetter

Subscribe to our newsletter and stay updated!