Case Study Details

Leveling the Ground at Babson’s Innovation Center

Black Bear was brought in to integrate existing concrete slab with new concrete floors that would complete the re-envisioned room

Project Overview
Babson College required modification to their classrooms in Olin Hall. Black Bear was brought in to integrate existing concrete slab with new concrete floors that would complete the re-envisioned room
The Process
  • STEP 1
    Shot blast/grind substrate flooring
  • STEP 2
    Apply Vapor Mitigation Primer
  • STEP 3
    CMP Specialty Product and CMP Diamond Cap applied
  • STEP 4
    Polished topping installed at a ¼ inch (leveling floor)
Project Details
  • Project Name - Babson College, Olin Hall
  • Type of Business - Non-Profit / Education
  • Location - Wellesley, Massachusetts
  • Size - 2,100 sqft
  • Timeframe - 4 Days
  • Products - CMP Specialty Product, CMP Diamond Cap, Vapor Mitigation Primer
Challenges
Black Bear needed to salvage the current concrete and engineer a new industrial flooring to meet the height of the existing floor within a restrictive timeframe to be completed over four nights.

Black Bear's Solution

An evaluation of the concrete foundation determined that a new concrete floor was value engineered to seamlessly integrate the existing base to become one unified system.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Quiz

Case Studies

Proven Results Through Real Cases

Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...

Continue Reading…
Leveling the Ground at Babson’s Innovation Center

Black Bear was brought in to integrate existing concrete slab with new concrete floors that would complete the re-envisioned room

Continue Reading…
Waterproofing & Moisture Mitigation for Multi-Level Commercial Kitchen

Black Bear was asked to propose solutions for both moisture control, and easier maintenance in an area that adheres to FDA health codes and OSHA...

Continue Reading…
VCT Commercial Floor Replacement for Shaw’s Supermarket

Shaw’s Supermarket needed a cost-effective, longer lasting solution that would replace the existing failing VCT commercial flooring.