Case Study Details

Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Project Overview
The general contractor reached out to Black Bear Coatings & Concrete to recoat flooring in need of repair. The original request was a simple topcoat overlay. Upon assessment of both spaces it was revealed that the substrate was uneven and the environment’s moisture would need to be addressed or pose a threat to new product. Thus, Black Bear value engineered a more extensive and effective solution.
The Process
  • STEP 1
    Level uneven floor using Dur A Flex
  • STEP 2
    Apply Polycrete SLM at 1/8 of an inch
  • STEP 3
    Fill with DuraGuard SL at 100 mils
  • STEP 4
    Apply ArmorTop satin filled with Polyurea Metzger M
Project Details
  • Project Name - Baxalta: Cold Storage and Loading Dock
  • General Contractor - Consigli Construction
  • Type of Business - Pharmaceutical Manufacturing
  • Location - Milford, Massachusetts
  • Size - 8,300 sqft
  • Timeframe - 10 Days
  • Products - Dur A Flex, Polycrete SLM, DuraGuard, Armor Top, Polyurea Metzger M
Challenges
With tight timelines and two separate jobsites within the facility, the Black Bear crew needed to work swiftly during off hours. Each space presented a unique set of requirements from climate control to the weighted pressure of machinery tread. The coordination of working in shifts meant that while one area’s application set the other area was prepped for processing.

Black Bear's Solution

Black Bear proposed a cost-effective solution that included leveling the unsound existing floors and installing a moisture mitigation system prior to the new product. A seamless, waterproof system was created to provide better protection in both areas of the facility.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Quiz

Case Studies

Proven Results Through Real Cases

Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...

Continue Reading…
Leveling the Ground at Babson’s Innovation Center

Black Bear was brought in to integrate existing concrete slab with new concrete floors that would complete the re-envisioned room

Continue Reading…
Waterproofing & Moisture Mitigation for Multi-Level Commercial Kitchen

Black Bear was asked to propose solutions for both moisture control, and easier maintenance in an area that adheres to FDA health codes and OSHA...

Continue Reading…
VCT Commercial Floor Replacement for Shaw’s Supermarket

Shaw’s Supermarket needed a cost-effective, longer lasting solution that would replace the existing failing VCT commercial flooring.

Continue Reading…