Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Project Overview
The general contractor reached out to Black Bear Coatings & Concrete to recoat flooring in need of repair. The original request was a simple topcoat overlay. Upon assessment of both spaces it was revealed that the substrate was uneven and the environment’s moisture would need to be addressed or pose a threat to new product. Thus, Black Bear value engineered a more extensive and effective solution.
The Process
  • STEP 1
    Level uneven floor using Dur A Flex
  • STEP 2
    Apply Polycrete SLM at 1/8 of an inch
  • STEP 3
    Fill with DuraGuard SL at 100 mils
  • STEP 4
    Apply ArmorTop satin filled with Polyurea Metzger M
Project Details
  • Project Name - Baxalta: Cold Storage and Loading Dock
  • General Contractor - Consigli Construction
  • Type of Business - Pharmaceutical Manufacturing
  • Location - Milford, Massachusetts
  • Size - 8,300 sqft
  • Timeframe - 10 Days
  • Products - Dur A Flex, Polycrete SLM, DuraGuard, Armor Top, Polyurea Metzger M
Challenges
With tight timelines and two separate jobsites within the facility, the Black Bear crew needed to work swiftly during off hours. Each space presented a unique set of requirements from climate control to the weighted pressure of machinery tread. The coordination of working in shifts meant that while one area’s application set the other area was prepped for processing.

Black Bear's Solution

Black Bear proposed a cost-effective solution that included leveling the unsound existing floors and installing a moisture mitigation system prior to the new product. A seamless, waterproof system was created to provide better protection in both areas of the facility.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Assessment

Case Studies

Proven Results Through Real Cases

REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR
REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR

Black Bear Seamless Flooring transformed Heav’nly Donuts Factory & Warehouse with a urethane cement floor, improving durability, safety and compliance.

Continue Reading…
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL

Black Bear Seamless Flooring modernized bathrooms with seamless, low-maintenance epoxy systems for a safer, more stylish campus experience.

Continue Reading…
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions

The Black Bear Seamless Flooring team provided a flawless Grind & Seal flooring solution to enhance durability and mitigate dust for the leading engineering company.

Continue Reading…
Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...