Case Study Details

Transforming Two Floors Of An Old Mill Into A Scientific Research Facility

Project Overview
Black Bear Coatings & Concrete was tasked with preparing existing foundations on multiple floors. In addition to surface renovation, a new solution needed to be engineered that would meet strict state and federal compliance.
The Process
  • STEP 1
    Prep and stabilize existing sub-floor
  • STEP 2
    Install 4-6 inch coves throughout
  • STEP 3
    Combine flexible epoxy, Poly-Crete WR, non-shrink urethane mortar
  • STEP 4
    Apply Elast-O-Coat double flake broadcast
  • STEP 5
    Install epoxy grout coat
  • STEP 6
    Use aliphatic urethane
  • STEP 7
    Apply Armor Top
Project Details
  • Project Name - Biomere – 2 projects: 3rd & 5th Floors
  • General Contractor - Forever Mechanical
  • Type of Business - Pharmaceutical
  • Location - Worcester, Massachusetts
  • Size - 21,100 sqft
  • Timeframe - 10 Days
  • Products - Flexible Epoxy, Poly-Crete WR, Poly-Crete SL, Poly-Crete Shop Floor, Non-shrink Urethane Mortar, Elast-O-Coat, Aliphatic Urethane, Armor Top
Challenges
When renovating the older mill building to accommodate a new state-of-the-art pharmaceutical company, it was apparent that parts of the floor could not be salvaged. It was necessary for Forever Mechanical to screw the floor back into the sub-floor to stabilize it and ready the spaces for Black Bear’s system. Black Bear’s crew needed to patch all screws and repair and replace cove base.

Black Bear's Solution

With the 5th floor of the building in dire condition, Black Bear proposed a flexible membrane, Shop Floor, and 2,400 linear feet of custom cove to renovate the space. With both sections of the building, crews needed to demo the existing floor and stabilize the foundation before applying epoxy and urethane layers that would insulate and waterproof the floors to protect against bacterial growth.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Assessment

Case Studies

Proven Results Through Real Cases

REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR
REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR

Black Bear Seamless Flooring transformed Heav’nly Donuts Factory & Warehouse with a urethane cement floor, improving durability, safety and compliance.

Continue Reading…
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL

Black Bear Seamless Flooring modernized bathrooms with seamless, low-maintenance epoxy systems for a safer, more stylish campus experience.

Continue Reading…
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions

The Black Bear Seamless Flooring team provided a flawless Grind & Seal flooring solution to enhance durability and mitigate dust for the leading engineering company.

Continue Reading…
Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...

Continue Reading…

NewsLetter

Subscribe to our newsletter and stay updated!