Case Study Details
With the 5th floor of the building in dire condition, Black Bear proposed a flexible membrane, Shop Floor, and 2,400 linear feet of custom cove to renovate the space. With both sections of the building, crews needed to demo the existing floor and stabilize the foundation before applying epoxy and urethane layers that would insulate and waterproof the floors to protect against bacterial growth.
Takes just 2 min
Take the AssessmentCase Studies