Northeast’s leading seamless? Call Us Now 978-405-0017

Connect With Us: Social Social Social Social

Industries Served

Our Services

Our Resources

Our Projects

Service Areas

About Black Bear

Help & Support

Case Study Detail

Diner’s Expansion to New Location Required Swift, Accurate Installation of New Flooring

Having built a reputation for longer-lasting products for restaurants and the food and beverage industry, the Black Bear team was uniquely qualified to provide solution options for the new space.

Project Overview
The Early Harvest Diner was expanding to a new location in Beverly, MA. They reached out to Black Bear Coatings & Concrete directly to provide consultation on “front of house” work. Having built a reputation for longer-lasting products for restaurants and the food and beverage industry, the Black Bear team was uniquely qualified to provide solution options for the new space.
The Process
  • STEP 1
    Assess the space to determine state of flooring
  • STEP 2
    Prep existing floors for new floor system
  • STEP 3
    Applied urethane cement with decorative flake
  • STEP 4
    Installed 2 topcoats for extra protection
Project Details
  • Project Name - Beverly Location Dining Area
  • Type of Business - Restaurant
  • Location - Beverly, Massachusetts
  • Size - 1,600 Sqft
  • Timeframe - 3 days to complete
  • Products - Dur-A-Flex Poly-Crete SLC |ACCELERA topcoats
Challenges
With an anticipated open date set, the Black Bear team had to work within a tight timeframe to complete the job. The restaurant flooring needed to be both durable and aesthetically pleasing, since it was a customer facing space, and Black Bear needed to plan each phase of the project strategically over three days to meet deadlines.

Black Bear Solution

Applying a urethane cement with decorative flake and urethane topcoats, Black Bear was able to provide the Diner with the tough, resilient surface they needed to withstand both the foot traffic and the constant sanitization required for compliance. Plus, the speckled design enhanced the overall look and feel of the entire dining space.

Not Sure Which Floor Is Right for You?

Takes just 2 min

Take the Assessment

Case Studies

Proven Results Through Real Cases

REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR
REBUILDING THE FOUNDATION: FROM CUT-UP CONCRETE TO SEAMLESS, SLIP-RESISTANT FLOOR

Black Bear Seamless Flooring transformed Heav’nly Donuts Factory & Warehouse with a urethane cement floor, improving durability, safety and compliance.

Continue Reading…
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL
TRANSFORMING CAMPUS HOUSING: MODERN BATHROOMS FOR A COLLEGE-PREPARATORY SCHOOL

Black Bear Seamless Flooring modernized bathrooms with seamless, low-maintenance epoxy systems for a safer, more stylish campus experience.

Continue Reading…
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions
Black Bear Seamless Flooring Delivers On-Time, Low-Maintenance Flooring for Evolution Motion Solutions

The Black Bear Seamless Flooring team provided a flawless Grind & Seal flooring solution to enhance durability and mitigate dust for the leading engineering company.

Continue Reading…
Multi-Phase Commercial Flooring Installation for Catania-Spagna’s Food Manufacturing Plant

Black Bear ensured a swift transition from one building to the next, while adhering to strict USDA and regulatory standards.

Continue Reading…
Patchy Floors Required Black Bear to Transform GF Solutions’ Commercial Warehouse into a USDA Approved Food Processing Plant

The Black Bear team provided a slip-resistant, durable floor that was easier to maintain and would support the production facility.

Continue Reading…
Pharmaceutical Manufacturer Required A Level Substrate and Moisture Mitigation System to Stay Compliant

Black Bear value engineered a more extensive and effective solution for flooring in need of repair.

Continue Reading…
Black Bear Helps Transform Warehouse into a Biological Manufacturing Facility and Processing Center

Using only 20,000 sqft of the 80,000 square foot space, the general contractor on the project reached out to Black Bear to help prepare and...

Continue Reading…

NewsLetter

Subscribe to our newsletter and stay updated!