Case Study Details
Black Bear assessed the wash bay site and determined that a water resistant system was needed to withstand the run-off from production. The flooring and adjacent walls needed to be easily cleaned and maintained throughout the space, and this would be achieved by installing epoxy throughout. The existing spaces were prepped to accommodate a new, seamless solution.
Takes just 2 min
Take the AssessmentCase Studies